Greenfield Industrial
All projects

Industrial · Wingfield

Greenfield Industrial

Overview

6,200 square metres. Eighteen-metre clear spans. Heavy equipment loading. A warehouse built to expand.

Challenge

Maximum span with minimum steel tonnage. Budget held against performance.

Solution

Portal frame geometry optimised in engineering. Twelve percent less steel than initial estimate, with the same span and same load.

Outcome

Certified on programme. Client into fit-out immediately.

Greenfield Industrial detail
Greenfield Industrial 3
Greenfield Industrial 4
Greenfield Industrial 5
Greenfield Industrial 6
Greenfield Industrial 7
Greenfield Industrial 8